Wax, Sludge and Sand Reduced in Trunkline | Merus Oil & Gas
Wax, Sludge and Sand Reduced in Trunkline
Inapoi la studiile de cazMidstream

Wax, Sludge and Sand Reduced in Trunkline

Reducing multiple contaminants in a major trunk line through combined Merus treatment.

Trunk lines transporting crude oil over long distances face combined challenges from wax deposition, sludge accumulation, and sand carryover. These materials progressively reduce pipeline capacity and increase pumping energy requirements.

A major trunk line was experiencing accelerating buildup of wax, sludge, and sand deposits. Pigging operations were becoming more frequent and the recovered material volumes were increasing, indicating a worsening condition.

Merus technology installed at the pipeline inlet reduced the accumulation of all three contaminant types. The pipeline showed improved flow characteristics, and pigging runs recovered significantly less material, indicating that deposits were not forming at the previous rate.

Rezultate cheie

01

Combined contaminant accumulation reduced

02

Pigging material recovery decreased significantly

03

Pipeline capacity maintained

Wax, Sludge and Sand Reduced in Trunkline

Pregatiti sa va optimizati operatiunile?

Contactati-ne pentru o perioada de proba cu preturi fixe. Masuram performanta inainte si dupa instalare.

Solicitati o consultare