
Maintaining flow line and trunk line integrity and capacity through preventive Merus treatment.
Flow lines and trunk lines form the arterial system of oil and gas production operations. Their integrity and capacity directly determine production capability and operational efficiency.
This case examines the application of Merus technology to maintain pipeline performance in a producing field. Multiple issues including corrosion, wax deposition, and scaling were gradually reducing pipeline capacity.
A comprehensive Merus Ring installation program across the field's pipeline network addressed multiple flow assurance challenges simultaneously. The preventive treatment approach maintained pipeline capacity and extended the intervals between cleaning and maintenance operations.
Proven Performance
Key Results
Pipeline capacity maintained at design levels
Maintenance intervals extended
Multiple flow assurance issues addressed simultaneously

Midstream
Related Case Studies
MidstreamSeparation Process of Oil, Gas and Water
Enhancing three-phase separation efficiency in oil and gas processing facilities.
Read Case Study
MidstreamReducing Sludge in Oil Pipelines
Minimizing sludge accumulation in oil transportation pipelines through non-chemical treatment.
Read Case Study
MidstreamEmulsion Treatment
Breaking crude oil emulsions to improve separation efficiency and product quality.
Read Case StudyReady to Optimize Your Operations?
Contact us for a trial period with fixed pricing. We measure performance before and after installation.
Request a Consultation