Pipeline pigging is a necessary but expensive operation that interrupts normal flow and requires specialized equipment and personnel. Pour Point Depressants (PPD) are chemicals injected to keep crude oil flowing at lower temperatures.
A pipeline operator was spending significantly on both regular pigging operations and continuous PPD injection. The combination of wax and sludge buildup required frequent pigging runs, while PPD was needed to maintain flow during colder periods.
After Merus Ring installation, the pipeline showed reduced wax and sludge accumulation, allowing pigging frequency to be decreased. Additionally, the improved flow characteristics reduced the required PPD injection rates.
Rendimiento comprobado
Resultados clave
Pigging frequency reduced by 50%
PPD chemical usage reduced by 30%
Operating costs significantly decreased

Midstream
Related Case Studies
MidstreamSeparation Process of Oil, Gas and Water
Enhancing three-phase separation efficiency in oil and gas processing facilities.
Leer caso de estudio
MidstreamReducing Sludge in Oil Pipelines
Minimizing sludge accumulation in oil transportation pipelines through non-chemical treatment.
Leer caso de estudio
MidstreamEmulsion Treatment
Breaking crude oil emulsions to improve separation efficiency and product quality.
Leer caso de estudioListo para optimizar sus operaciones?
Contactenos para un periodo de prueba con precios fijos. Medimos el rendimiento antes y despues de la instalacion.
Solicitar una consulta